A Closer Look at How the L Train Shutdown Will Disrupt Transit Trips

This diagram shows the alternate routes commuters would have to take to travel between L Train stops. Image: BRT Planning International
Without L train service in Manhattan, trips that used to be a one-seat ride between these origins (y-axis) and destinations (x-axis) will involve multiple transfers and/or long walks. Image: BRT Planning International

The 18-month shutdown of the L train between North Brooklyn and Eighth Avenue may be three years away, but officials still have to move quickly to help hundreds of thousands of L passengers get where they need to go. So far, city officials and the MTA have yet to provide much in the way of specifics.

To get a better sense of how transit service should adapt for the L shutdown, Annie Weinstock and Walter Hook of BRT Planning International analyzed how the loss of the L train west of Bedford Avenue would affect trip times if no measures are taken. Trips between Brooklyn and Manhattan that are currently a one-seat ride will become far more convoluted and inconvenient, as you can see in the top matrix.

Translated into time lost, the effect is most severe for L train riders who cannot conveniently connect to other subway lines at Myrtle/Wyckoff or Broadway Junction. You can see in the matrix below (which includes travel times between a sample of L train stations and other stations) that people by the Brooklyn stops west of Myrtle/Wyckoff are most affected.

The table shows additional travel times between stations impacted by the L Train shutdown. Image: BRT Planning International
How the L train shutdown would affect travel times between various points (including places not along the L) if no changes are made to the transit network. Image: BRT Planning International

In line with L train contingency plans released by other groups, they argue that the MTA should increase frequency on the J/M and G lines and allow free transfers between the G and the J/M at Lorimer, the Manhattan-bound F at Bergen Street, and Atlantic Terminal. They also recommend maintaining service frequency on the L east of Bedford Avenue.

Ferries, they note, will have limited value, since the services “help only the people near the Williamsburg and Greenpoint ferry terminals traveling to East 34th Street (and potentially E. 20th St).”

When Mayor de Blasio was asked in July about dealing with the L train shutdown, however, he emphasized ferry service as the city’s main contribution, largely deflecting responsibility for better bus service to the MTA, which can run more buses but doesn’t control the streets.

Hook and Weinstock say the city will have to claim street space for bus rapid transit routes to make up for the loss of the L. Merely adding shuttle service in mixed traffic will not be enough. “Shuttle buses that take people to subway stations would back up on already congested streets and would represent another leg in an already multi-legged trip,” they write. “Most people would not take them.”

In January, Hook and Weinstock proposed BRT routes for North Brooklyn and Delancey Street to serve displaced L passengers and meet long-term demand for transit across the East River. Based on their new analysis, they’ll be updating those plans soon.

ALSO ON STREETSBLOG

The MTA and DOT did not indicate any plans for busways on surface streets in a presentation to elected officials last week about the L train shutdown. Image: MTA

There’s Got to Be More to the L Train Shutdown Plan Than What the MTA and DOT Have Shown So Far

|
Starting in January 2019, service on the L train west of Bedford Avenue will be suspended for 15 months to allow for Sandy-related repairs. The only way to keep hundreds of thousands of people moving is to dedicate significant street space to buses on both sides of the East River. But at a presentation to elected officials on Friday, the MTA and DOT did not indicate that bus lanes are part of their plan, except on the Williamsburg Bridge itself.
If you live in Greenpoint (the blue pin), the darkest red areas of this map would take at least 25 minutes longer to reach via transit without the L train. Image: Sidewalk Labs

Mapping Life Without the L Train

|
This fall, DOT and the MTA will unveil their plan to keep New Yorkers moving when the L train west of Bedford Avenue shuts down for repairs. But what if the L train went away and nothing took its place? A new mapping tool from Sidewalk Labs, “NYC Transit Explorer,” shows how far you can get via transit from any point in a given amount of time. It also includes an option to see how things change when you strip the western segment of the L train out of the system.